<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>LBH Africa, Author at LBH Group | Africa</title>
	<atom:link href="https://lbhafrica.com/author/lbhafrica_bridget/feed/" rel="self" type="application/rss+xml" />
	<link>https://lbhafrica.com/author/lbhafrica_bridget/</link>
	<description>Global Network. Local Expertise. Navigate Africa With Us.</description>
	<lastBuildDate>Tue, 01 Sep 2026 11:45:25 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1</generator>

<image>
	<url>https://lbhafrica.com/wp-content/uploads/2025/09/LBH-Group-Africa_icon-150x150.png</url>
	<title>LBH Africa, Author at LBH Group | Africa</title>
	<link>https://lbhafrica.com/author/lbhafrica_bridget/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>An Unusual Caller at Durban Port</title>
		<link>https://lbhafrica.com/an-unusual-caller-at-durban-port/</link>
		
		<dc:creator><![CDATA[LBH Africa]]></dc:creator>
		<pubDate>Tue, 01 Sep 2026 11:45:25 +0000</pubDate>
				<category><![CDATA[Port & Vessel Operations]]></category>
		<guid isPermaLink="false">https://lbhafrica.com/?p=2203</guid>

					<description><![CDATA[<p>LBH Durban was honoured to represent the Dutch-flagged cutter suction dredger MV Artemis during her brief stop in Durban last week for stores and husbandry services before continuing her voyage to Cape Town. Built in 2013, Artemis is one of the larger cutter suction dredgers operating internationally, measuring approximately 129 metres in length. Designed for...</p>
<p>The post <a href="https://lbhafrica.com/an-unusual-caller-at-durban-port/">An Unusual Caller at Durban Port</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>LBH Durban was honoured to represent the Dutch-flagged cutter suction dredger MV Artemis during her brief stop in Durban last week for stores and husbandry services before continuing her voyage to Cape Town.</p>
<p>Built in 2013, Artemis is one of the larger cutter suction dredgers operating internationally, measuring approximately 129 metres in length. Designed for hard ground dredging, the vessel is capable of excavating compacted clay and rock and can operate at depths of up to 31 metres.</p>
	<div id="gap-872506996" class="gap-element clearfix" style="display:block; height:auto;">
		
<style>
#gap-872506996 {
  padding-top: 15px;
}
</style>
	</div>
	
<p><em><a href="https://www.linkedin.com/feed/update/urn:li:activity:7498273101701427200" target="_blank">Read full insight on LinkedIn</a></em></p>
<p>The post <a href="https://lbhafrica.com/an-unusual-caller-at-durban-port/">An Unusual Caller at Durban Port</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Ressano Garcia Border Post Upgrade: Transforming the Maputo Corridor and Mineral Exports</title>
		<link>https://lbhafrica.com/ressano-garcia-border-post-upgrade/</link>
		
		<dc:creator><![CDATA[LBH Africa]]></dc:creator>
		<pubDate>Tue, 01 Sep 2026 11:41:06 +0000</pubDate>
				<category><![CDATA[Logistics]]></category>
		<guid isPermaLink="false">https://lbhafrica.com/?p=2200</guid>

					<description><![CDATA[<p>Construction has commenced on the US$15 million modernisation of the Ressano Garcia One-Stop Border Post, with authorities targeting substantial improvements such as: • Expansion of entry and exit lanes at KM4 • Dedicated access routes for mineral trucks destined for the Port of Maputo • Improved internal traffic circulation and border infrastructure • Digitalisation and...</p>
<p>The post <a href="https://lbhafrica.com/ressano-garcia-border-post-upgrade/">Ressano Garcia Border Post Upgrade: Transforming the Maputo Corridor and Mineral Exports</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Construction has commenced on the US$15 million modernisation of the Ressano Garcia One-Stop Border Post, with authorities targeting substantial improvements such as:</p>
<p>• Expansion of entry and exit lanes at KM4<br />
 • Dedicated access routes for mineral trucks destined for the Port of Maputo<br />
 • Improved internal traffic circulation and border infrastructure<br />
 • Digitalisation and automation of cross-border control processes<br />
 • Real-time data sharing and system integration between Mozambican and South African authorities<br />
 • Implementation of a true one-stop border post, eliminating duplicate customs and immigration stops</p>
	<div id="gap-1180834619" class="gap-element clearfix" style="display:block; height:auto;">
		
<style>
#gap-1180834619 {
  padding-top: 15px;
}
</style>
	</div>
	
<p><em><a href="https://www.linkedin.com/feed/update/urn:li:activity:7497910778906353664" target="_blank">Read full insight on Linkedin</a></em></p>
<p>The post <a href="https://lbhafrica.com/ressano-garcia-border-post-upgrade/">Ressano Garcia Border Post Upgrade: Transforming the Maputo Corridor and Mineral Exports</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Richards Bay Port Congestion: Logistics Challenges and the Impact on South Africa’s Bulk Exports</title>
		<link>https://lbhafrica.com/richards-bay-port-under-pressure/</link>
		
		<dc:creator><![CDATA[LBH Africa]]></dc:creator>
		<pubDate>Tue, 01 Sep 2026 11:33:31 +0000</pubDate>
				<category><![CDATA[Port & Vessel Operations]]></category>
		<guid isPermaLink="false">https://lbhafrica.com/?p=2197</guid>

					<description><![CDATA[<p>RICHARDS BAY PORT: Rising congestion, rail challenges and escalating costs at the Richards Bay Dry Bulk and Multi-Purpose Terminal are placing increasing pressure on supply chains and having a direct impact on export volumes for bulk commodities such as coal, chrome and magnetite. The implementation of Gate Zero, the Permit Office, OTSA and Shincell staging...</p>
<p>The post <a href="https://lbhafrica.com/richards-bay-port-under-pressure/">Richards Bay Port Congestion: Logistics Challenges and the Impact on South Africa’s Bulk Exports</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>RICHARDS BAY PORT: Rising congestion, rail challenges and escalating costs at the Richards Bay Dry Bulk and Multi-Purpose Terminal are placing increasing pressure on supply chains and having a direct impact on export volumes for bulk commodities such as coal, chrome and magnetite.</p>
<p>The implementation of Gate Zero, the Permit Office, OTSA and Shincell staging areas has provided some relief by reducing congestion on the N2. However, trucks frequently remain at these staging areas for periods of 24 to 48 hours before being released into the relevant stockpile areas within the terminal. Once released, trucks are generally restricted to entering and exiting through a single point on the gravel road within the port, creating a bottleneck. </p>
<p>A further challenge is that the Port of Richards Bay was not originally designed to accommodate the current volume of road motor transporters (RMTs). Although sections of the road infrastructure have been refurbished, the high volume of heavy vehicle traffic continues to place substantial strain on the road network. The port handles approximately 1,500 RMT movements per day, placing considerable pressure on infrastructure that was not designed for this level of sustained truck traffic.</p>
	<div id="gap-2042703883" class="gap-element clearfix" style="display:block; height:auto;">
		
<style>
#gap-2042703883 {
  padding-top: 15px;
}
</style>
	</div>
	
<p><em><a href="https://www.linkedin.com/feed/update/urn:li:activity:7495373949229252608" target="_blank">Read full insight on Linkedin</a></em></p>
<p>The post <a href="https://lbhafrica.com/richards-bay-port-under-pressure/">Richards Bay Port Congestion: Logistics Challenges and the Impact on South Africa’s Bulk Exports</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Additional routing options boost export access</title>
		<link>https://lbhafrica.com/additional-routing-options-boost-export-access/</link>
		
		<dc:creator><![CDATA[LBH Africa]]></dc:creator>
		<pubDate>Tue, 01 Sep 2026 11:25:11 +0000</pubDate>
				<category><![CDATA[African Hub]]></category>
		<guid isPermaLink="false">https://lbhafrica.com/?p=2195</guid>

					<description><![CDATA[<p>Africa is entering a new project cargo investment cycle, with major developments in LNG, mining, renewable energy and industrial infrastructure driving demand for heavy-lift and specialised logistics. As governments and private investors commit billions of dollars to projects across the continent, the sector is preparing for a pipeline of increasingly complex cargo movements. &#8220;Africa is...</p>
<p>The post <a href="https://lbhafrica.com/additional-routing-options-boost-export-access/">Additional routing options boost export access</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Africa is entering a new project cargo investment cycle, with major developments in LNG, mining, renewable energy and industrial infrastructure driving demand for heavy-lift and specialised logistics. As governments and private investors commit billions of dollars to projects across the continent, the sector is preparing for a pipeline of increasingly complex cargo movements.</p>
<p>&#8220;Africa is once again becoming the focus of resource development, from bulk projects on a truly massive scale, like the Guinean iron ore developments, to the almost &#8217;boutique&#8217; but strategically important rare earth and platinum group metals (PGM) projects,&#8221; said Athol Emerton, managing director of LBH Mozambique.</p>
<p>Speaking to Freight News, he said several major infrastructure developments were expected to reshape project cargo flows. “The Lobito Corridor in Angola, renewed momentum on the Nacala Corridor and the continued development of Namibia&#8217;s transport corridors are creating additional routing options for project cargo while improving access to export markets for bulk minerals.”</p>
<p>South Africa&#8217;s terminal upgrade programme and the long-awaited introduction of private rail operators are also boosting confidence. In Mozambique, the planned expansion of the Port of Maputo and growing cargo volumes along the Maputo Corridor demonstrate the value of integrated corridor development, said Emerton.</p>
<p>Similar initiatives are under way in West Africa, where multiple corridor projects are expected to unlock future project cargo movements and support mineral exports.</p>
<p>“I am really excited about the future project scenario in Africa, although it does need careful focus and country-specific knowledge. We have been involved in the LNG projects in Afungi since handling the first exploration vessels back in mid-2008 and it has been rewarding to support such a broad range of project logistics as the development has progressed. It is arguably the biggest project underway in Africa,” he said.</p>
<p>That optimism is reflected in growing project cargo activity across the continent. According to Emerton, volumes are increasing as investment gathers pace.</p>
<p>&#8220;There are only two frontier continents left with real scope for resource exploration – Africa and Antarctica. And it&#8217;s far too cold down in the latter, so let&#8217;s focus on warm, friendly Africa!&#8221; he quipped.</p>
<p>The sector, however, is not without challenges. &#8220;In Africa, logistics for these massive projects demand a practical response: corridor capacity, port productivity, customs efficiency and multimodal connectivity all need to improve together. This means dialogue between any country&#8217;s bureaucracy and resource project investors needs to be open and pragmatic at all times,&#8221; said Emerton.</p>
<p>&#8220;I fear there is often great political and investor enthusiasm to unlock Africa&#8217;s large resources with projects, but the momentum slows at a practical level through complex bureaucracy, from customs regimes to heavy-lift equipment permitting.&#8221;</p>
<p>Practical constraints often extend well beyond ports and terminals. A country may have a modern, efficient port, but a damaged bridge several hundred kilometres inland or ageing road infrastructure can quickly become the weakest link in the logistics chain. Successfully executing complex project cargo movements therefore requires detailed local knowledge and careful planning across the entire transport corridor.</p>
<p>Emerton said demand for breakbulk and project cargo logistics would continue to grow as infrastructure improves and delayed projects move forward over the next two years. However, unlocking Africa&#8217;s full potential will depend on seamless integration between ocean carriers, ports, inland transport providers and last-mile logistics, supported by stronger collaboration between governments and industry.</p>
<p>11 Aug 2026 &#8211; By Liesl Venter <a href="https://www.freightnews.co.za/article/additional-routing-options-boost-export-access-0">FTW</a></p>
	<div id="gap-944650240" class="gap-element clearfix" style="display:block; height:auto;">
		
<style>
#gap-944650240 {
  padding-top: 15px;
}
</style>
	</div>
	
<p><em><a href="https://www.freightnews.co.za/article/transporters-slam-richards-bay-truck-staging-fees" target="_blank">Read full insight on FTW</a></em></p>
<p>The post <a href="https://lbhafrica.com/additional-routing-options-boost-export-access/">Additional routing options boost export access</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>FTW: Transporters Slam Richards Bay Truck Staging Fees</title>
		<link>https://lbhafrica.com/ftw-transporters-slam-richards-bay-truck-staging-fees/</link>
		
		<dc:creator><![CDATA[LBH Africa]]></dc:creator>
		<pubDate>Tue, 01 Sep 2026 11:12:20 +0000</pubDate>
				<category><![CDATA[Logistics]]></category>
		<guid isPermaLink="false">https://lbhafrica.com/?p=2190</guid>

					<description><![CDATA[<p>FTW reports that mandatory Gate Zero staging fees have added costs without easing congestion at the Port of Richards Bay. Despite paying to use the facility under a “No Ticket, No Entry” system, transporters report that trucks are still waiting up to two days to offload. Questions have also been raised about deteriorating road conditions,...</p>
<p>The post <a href="https://lbhafrica.com/ftw-transporters-slam-richards-bay-truck-staging-fees/">FTW: Transporters Slam Richards Bay Truck Staging Fees</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>FTW reports that mandatory Gate Zero staging fees have added costs without easing congestion at the Port of Richards Bay.</p>
<p>Despite paying to use the facility under a “No Ticket, No Entry” system, transporters report that trucks are still waiting up to two days to offload. Questions have also been raised about deteriorating road conditions, damage to vehicles and whether the staging system is delivering sufficient operational benefit to justify the additional cost.</p>
<p>With Richards Bay handling significant bulk cargo volumes, efficient truck flows and supporting infrastructure are critical to the competitiveness of the wider logistics chain.</p>
	<div id="gap-1892173412" class="gap-element clearfix" style="display:block; height:auto;">
		
<style>
#gap-1892173412 {
  padding-top: 15px;
}
</style>
	</div>
	
<p><em><a href="https://www.freightnews.co.za/article/transporters-slam-richards-bay-truck-staging-fees" target="_blank">Read full insight on FTW</a></em></p>
<p>The post <a href="https://lbhafrica.com/ftw-transporters-slam-richards-bay-truck-staging-fees/">FTW: Transporters Slam Richards Bay Truck Staging Fees</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Mozambique&#8217;s New Mining Law</title>
		<link>https://lbhafrica.com/mozambiques-new-mining-law/</link>
		
		<dc:creator><![CDATA[LBH Africa]]></dc:creator>
		<pubDate>Tue, 01 Sep 2026 11:07:19 +0000</pubDate>
				<category><![CDATA[Commodity & Market Intelligence]]></category>
		<guid isPermaLink="false">https://lbhafrica.com/?p=2187</guid>

					<description><![CDATA[<p>A concise insight into Mozambique&#8217;s new Mining Law, and what it means for mineral processing within the country. As Mozambique reshapes its mining sector, the new legislation places greater emphasis on local value addition, encouraging the processing and beneficiation of minerals before export. What does this mean for investors, mining companies, and the broader economy?...</p>
<p>The post <a href="https://lbhafrica.com/mozambiques-new-mining-law/">Mozambique&#8217;s New Mining Law</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>A concise insight into Mozambique&#8217;s new Mining Law, and what it means for mineral processing within the country.</p>
<ul>
<p>As Mozambique reshapes its mining sector, the new legislation places greater emphasis on local value addition, encouraging the processing and beneficiation of minerals before export.</p>
<p>What does this mean for investors, mining companies, and the broader economy? This brief overview unpacks the key changes, the opportunities they create, and the practical implications for stakeholders operating in the region.</p>
</ul>
	<div id="gap-288069975" class="gap-element clearfix" style="display:block; height:auto;">
		
<style>
#gap-288069975 {
  padding-top: 15px;
}
</style>
	</div>
	
<p><em><a href="https://www.linkedin.com/feed/update/urn:li:activity:7478552870829711370" target="_blank">Read full insight on LinkedIn</a></em></p>
<p>The post <a href="https://lbhafrica.com/mozambiques-new-mining-law/">Mozambique&#8217;s New Mining Law</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Pressure mounting for improved logistics efficiency</title>
		<link>https://lbhafrica.com/pressure-mounting-for-improved-logistics-efficiency/</link>
		
		<dc:creator><![CDATA[LBH Africa]]></dc:creator>
		<pubDate>Tue, 01 Sep 2026 10:54:57 +0000</pubDate>
				<category><![CDATA[African Hub]]></category>
		<guid isPermaLink="false">https://lbhafrica.com/?p=2183</guid>

					<description><![CDATA[<p>West African trade flows are changing as large-scale natural resource developments and rising global demand for bulk commodities reshape the region&#8217;s export landscape. In markets such as Guinea, Angola, Liberia and Ghana, rising bulk export volumes are creating new demands on transport and logistics networks. For the logistics sector, this presents significant opportunity, but also...</p>
<p>The post <a href="https://lbhafrica.com/pressure-mounting-for-improved-logistics-efficiency/">Pressure mounting for improved logistics efficiency</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>West African trade flows are changing as large-scale natural resource developments and rising global demand for bulk commodities reshape the region&#8217;s export landscape. In markets such as Guinea, Angola, Liberia and Ghana, rising bulk export volumes are creating new demands on transport and logistics networks. </p>
<p>For the logistics sector, this presents significant opportunity, but also highlights the ongoing challenge of aligning infrastructure capacity with rising demand. As bulk volumes increase, pressure is mounting on ports, corridors and shipping networks to improve efficiency, reduce delays and support more reliable cargo movement.</p>
<p>“Bulk commodities remain the backbone of African trade and what we are seeing now is a fundamental shift in scale,” said Athol Emerton, managing director of LBH Africa. “The real challenge is not whether demand exists &#8211; it’s whether logistics systems can keep pace with the volume and operational discipline required to move bulk cargo efficiently. This pressure means our customers need reliable and accurate information distributed to their network around the globe.”</p>
<p>Despite strong growth fundamentals, infrastructure constraints remain a defining feature of the region. Common challenges include limited port capacity relative to bulk export demand, landside bottlenecks affecting cargo flow and competition between export cargoes and essential imports.</p>
<p>In this environment, execution discipline is essential, said Emerton. “Bulk logistics relies on consistent, efficient performance and even minor supply chain inefficiencies can quickly drive up costs and disrupt operations. An efficient ships agency and logistics system works hard to ensure reliability and cost efficiency.” </p>
<p>The importance of efficient logistics is becoming increasingly evident as bulk commodity exports continue to expand across the region. This growth is being driven by several key commodity flows across the region, including bauxite and iron ore in Guinea, iron ore exports in Liberia, energy and mineral cargoes in Angola as well as continued diversified bulk and primary commodity flows through Ghana&#8217;s ports.</p>
<p>Guinea, for example, has established itself as a dominant player in global bauxite supply, with seaborne exports increasing significantly in recent years and reaching record levels as infrastructure capacity expands. Simandou now also gives the country access to high-quality iron ore, supported by a world-class integrated rail and port system capable of handling up to 100+ million tonnes per annum at peak capacity. Similarly, Liberia is potentially scaling up iron ore exports through rail and port infrastructure upgrades and various opportunities </p>
<p>According to Emerton, copper continues to emerge as one of the most strategically important bulk commodities globally. “Demand continues to rise sharply, with projections indicating sustained long-term growth driven by energy transition requirements. At the same time, It is clear that the landlocked copper producing countries need more corridor capacity,” said Emerton. “Across Africa, copper exports remain concentrated in Central and Southern regions. However, the trade corridors connecting inland production areas to market are evolving, this important for reliable bulk corridors and ports.”</p>
<p>24 Jun 2026 &#8211; By Liesl Venter and Ed Richardson <a href="https://www.freightnews.co.za/article/pressure-mounting-for-improved-logistics-efficiency">FTW</a></p>
	<div id="gap-1174596808" class="gap-element clearfix" style="display:block; height:auto;">
		
<style>
#gap-1174596808 {
  padding-top: 15px;
}
</style>
	</div>
	
<p>The post <a href="https://lbhafrica.com/pressure-mounting-for-improved-logistics-efficiency/">Pressure mounting for improved logistics efficiency</a> appeared first on <a href="https://lbhafrica.com">LBH Group | Africa</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
